Bulk Sampling
| Item |
| Inside |
Outside
* Charge will apply after 30 days storage
* Minimum Charge of $25.00/day per lot may
apply |
Bulk Sampling
| Mesh Size |
| 4-10 |
10-20
* Sample Preparation and Assaying is a separate
charge
* Minimum Charge of $500.00/ton will apply under 1 ton
in volume
* Includes processing by all processing
circuits |
Processing Circuits
| Description |
| Primary Circuit Jaw Crusher |
| Secondary Circuit Jaw and Cone Crusher |
| Ball Mill Circuit |
| Screening (Secondary & Ball Mill Circuits) |
| Dust Collection Retrieval (All Circuits) |
Lot
Blending Surcharge
Materials Handling
Drying
| Drying Tables |
| Under 5% Moisture |
| 5% - 10% Moisture |
| 10% - 20% Moisture |
> 20% Moisture
* Minimum Charge Apply |
Cleanup And Purge
| Description |
All Circuits and Plant Clean-up and Purge
* Normal Purge used is
Limestone |
Micro-Smelting Circuit
| Description |
| Crude Bullion Furnace |
| Bullion Sales |
* Contract Smelting quotes available upon request
* Note: All slag wastes are the property of Polymet Labs.